RFI Types
- Design Information & Coordination
• Missing details
• Conflicting drawings
• Specification conflicts
• Discipline coordination
• Design clarification
- Constructability & Means/Methods
• Constructability concerns
• Alternative construction approaches
• Temporary works
• Access constraints
- Existing Conditions & Field Conflicts
• Utility conflicts
• Differing site conditions
• Existing structures
• Survey discrepancies
• Unknown obstructions
- Geotechnical & Environmental Conditions
• Soil conditions
• Rock excavation
• Groundwater
• Contamination
• Environmental constraints
- Construction Sequencing & Coordination
• Phasing
• Staging
• Traffic control
• Work interfaces
• Schedule conflicts
- Materials & Procurement
• Material substitutions
• Product availability
• Lead times
• Supplier issues
• Approved equals
- Scope & Contract Requirements
• Scope clarification
• Contract interpretation
• Responsibility allocation
• Deleted scope
• Quantity discrepancies
- Owner / Stakeholder Requested Changes
• Program changes
• Operational requirements
• Value engineering proposals
• Owner-directed modifications
- Regulatory & Third-Party Requirements
• Permit conditions
• Agency comments
• Railroad requirements
• Utility owner requirements
• Code compliance
- Quality, Testing & Acceptance
• Inspection requirements
• Testing procedures
• Acceptance criteria
• Certifications
• Warranty requirements