Blog Posts

- Identifying Item of Work and Related Work Tasks (Activities)Item of Work and Related Work Tasks (Activities) Work tasks (activities) are fundamental for cost estimating, project scheduling,
- Reading and Interpreting Geotechnical Soils ReportGeotechnical Investigations and Geotechnical Report (Soils Report) The geotechnical report communicates the site conditions, design, and construction recommendations.
- Demystifying Construction Project Scope Complexity with WBSDemystifying project scope complexity with WBS. Project scope complexity can be considered within the context of work tasks,
- Calculator – Construction Equipment Production Rate – BulldozerThe make and model for different construction equipment are extensive, and each manufacturer provides a performance chart to
- Earthwork Equipment SelectionThere are several factors to consider when selecting earthwork construction equipment. This chart pulls those factors into view
- Interactive H5P Content – Cost Estimating MethodsHere is an interactive and engaging H5P content on a branching scenario. Play to learn about the different
- Activity Naming Rule – A Set of InstructionsSituation: Ambiguous and inconsistent description of the name of an activity. Using an appropriate naming convention for an
- Cost Estimating and Bidding Process for Design-Bid-Build (DBB) Project Delivery MethodHave you ever wondered what the full spectrum of process is for cost estimating and bidding a project