Case Study: Delay from Regulatory Approvals on Seattle Tunnel Project (Seattle, WA, 2018)
Project Overview
• Name: Seattle Alaskan Way Viaduct Replacement Tunnel
• Location: Seattle, Washington
• Year: 2018
• Project Size: $3.3 billion
• Scope: Construction of a deep bored highway tunnel replacing an elevated viaduct
• Lead Agencies/Contractors: Washington State Department of Transportation (WSDOT) /
Category of the Issue, Problem, or Challenge
• Regulatory Approval
• Project Delay
Summary of the Issue, Problem, or Challenge
Delays in securing environmental and safety permits slowed critical construction phases, causing significant schedule slippage.
Root Cause Analysis
- Complex Regulatory Environment: Multiple agencies with overlapping jurisdiction created approval bottlenecks.
- Late Submission of Documentation: Required environmental impact reports and safety plans were submitted later than planned.
- Changing Regulatory Requirements: Amendments in regulations mid-project required rework of permits.
- Poor Coordination: Limited communication between project management and regulatory bodies.
Impacts Due to the Issue, Problem, or Challenge
- Delay of approximately 10 months.
- Increased overhead and contractor costs.
- Public frustration due to prolonged construction duration.
Corrective Actions Taken
- Created dedicated regulatory liaison teams for continuous agency engagement.
- Implemented earlier and more thorough regulatory submission planning.
- Adopted proactive tracking of regulation changes and quick response processes.
- Strengthened communication channels between project and regulators.
Lessons Learned
- Early, consistent engagement with regulators avoids approval delays.
- Regulatory timelines must be integrated into project schedules realistically.
- Flexibility to adapt to regulatory changes is critical.
Audit & Prevention: Project Control Questions to Ask on Future Projects to Help Control the Situation
- Are regulatory requirements fully understood and planned for?
- Is there continuous engagement with regulatory bodies?
- Are submission timelines strictly managed and tracked?