• Name: Houston Flood Control Expansion
• Location: Houston, Texas
• Year: 2021
• Project Size: $780 million
• Scope: Installation of large diameter drainage pipes and stormwater infrastructure
• Lead Agencies/Contractors: Harris County Flood Control District /
Category of the Issue, Problem, or Challenge
• Quality Control
• Geotechnical
• Materials
Summary of the Issue, Problem, or Challenge
Improper joint sealing and poor bedding compaction led to pipe misalignment and leakage issues requiring excavation and repair.
Root Cause Analysis
- Insufficient inspection of pipe joint assembly and sealing quality.
- Lack of standardized compaction testing during bedding preparation.
- Inadequate training of installation crews on pipe joint and bedding specifications.
- Poor QC documentation and enforcement in the field.
Impacts Due to the Issue, Problem, or Challenge
- Delay of 3 months due to excavation and repair works.
- Increased costs for labor, materials, and equipment.
- Risk of future flooding and infrastructure failure if leaks persisted.
Corrective Actions Taken
- Standardized pipe joint sealing and bedding compaction procedures.
- Increased inspection frequency for joints and bedding during installation.
- Provided training focused on pipe installation quality.
- Improved QC documentation and enforcement policies.
Lessons Learned
- Proper joint sealing and bedding compaction are critical for pipe longevity.
- Frequent inspections catch defects early.
- Training and documentation reinforce QC standards.
Audit & Prevention: Project Control Questions to Ask on Future Projects to Help Control the Situation
- Are pipe joints inspected and sealed properly?
- Is bedding compaction tested and documented?
- Are installation crews trained on QC standards?